  • Wilson Lake Master Plan

    Expiration date: 4/30/2021

    The U.S. Army Corps of Engineers, Kansas City District, has prepared a draft Master Plan for Wilson Lake with an Environmental Assessment and a Finding of No Significant Impact (FONSI) that are available for public review. These documents were prepared in accordance with the National Environmental Policy Act, and existing Corps policy and regulations.

  • Buck O'Neil Replacement Bridge across Missouri River

    Expiration date: 3/30/2021

    The proposed project constructs a new bridge across the Missouri River, west of the existing Buck O’Neil bridge, and makes improvements along US-169, north of the river between MO-9 and the new bridge including access improvements to the Kansas City Downtown Airport (MKC, airport). Construction is anticipated to begin in Summer 2021 and conclude in 2024.

  • Tyson Valley Powder Farm Proposed Plan

    Expiration date: 4/5/2021

    The U.S. Army Corps of Engineers (USACE) Kansas City District and the Missouri Department of Natural Resources (MDNR) will be holding a Public Meeting to discuss the Proposed No Action Plan for Selected Areas of Concern and Areas of Interest at the Former Tyson Valley Powder Farm.

  • Emergency Dredging General Authorization Renewal, Missouri River and Gasconade River Harbor

    Expiration date: 10/21/2020

    The U.S. Army Corps of Engineers, Kansas City District , has prepared a draft environmental

  • Rushville Levee Unit Public Notice

    Expiration date: 8/27/2020

    The U.S. Army Corps of Engineers , Kansas City District has prepared an Environmental Assessment and draft Finding of No Significant Impact (FONSI) in accordance to the National Environmental Policy Act (NEPA) of 1969, as amended, for the Rushville levee setback and realignment, authorized under Public Law 84-99. The recommended plan includes a levee realignment that would cross a National Resource Conservation Service (NRCS) Wetland Reserve Program Easement (WRP). The Rushville levee was damaged in the 2019 flood event, and the proposed project would restore flood protection to over 9,000 acres of land. Disturbed wetlands would be mitigated for at a site adjacent to the project. The environmental assessment was completed for USACE but is to be adopted by the NRCS and includes relevant NRCS information and guidance. The project assumes NRCS approval of the realignment. The landowner supports the levee realignment. The U.S. Army Corps of Engineers has made a preliminary determination that the proposed action would not result in significant degradation to the environment and therefore supports preparation of a draft FONSI. The EA, draft FONSI and supporting information are provided with issuance of this Public Notice on July 27, 2020 to initiate the public review and comment period, which will extend until August 27, 2020.