Latest Kansas City District Info

Public Notices

Results:
Archive: March, 2025
Clear
  • NWK-2024-772

    Expiration date: 4/30/2025

    APPLICANT: Clay County Highway Department PROJECT LOCATION: The project site is located at the crossing of Northeast 172nd Street over Muddy Fork. The project location is within Section 14, Township 53 North, Range 31 West, Clay County, Missouri. PROPOSED WORK: The applicant proposed to place fill material within waters of the Unites States for streambank grading and stabilization associated with replacement of the New Hope Creek Bridge.

  • NWK-2024-240

    Expiration date: 4/15/2025

    APPLICANT: Enbridge, Inc. PROJECT LOCATION: The project would affect waters of the United States associated with an unnamed tributary to Salt Branch. The project/review area is located on the south side of 220th Road, 1.4 miles west of the intersection of Missouri State Highway 127 and 220th Road in Section 19, Township 50 North, Range 22 West in Saline County, Missouri. PROPOSED WORK: The applicant requests authorization to realign the stream channel to optimize the pipeline elevation in the channel, back-slope the channel banks within the right-of-way, and place riprap armoring on both streambanks and within the streambed to protect against erosion.

  • NWK-2024-239

    Expiration date: 3/26/2025

    APPLICANT: Enbridge Inc. WATERWAY AND LOCATION: The project would affect waters of the United States associated with Straddle Creek. The project/review area is located on the NE side of Highway 65, 0.9-miles NW of the intersection of Highway 65 and Green Avenue in Section 35, Township 51 North, Range 22 West at Latitude: 39.16522 and Longitude: -93.28039 in Saline County, Missouri. PROPOSED WORK: The applicant requests authorization to realign the stream channel to optimize the pipeline elevation in the channel, back-slope the channel banks within the ROW, and place riprap armoring on both streambanks and within the streambed to protect against erosion.