Regulatory Notices

Civil Works/Planning Public Notices

Results:
Tag: USACE
Clear
  • Draft Grand River Feasibility Study & Environmental Assessment

    Expiration date: 11/20/2019

    The U.S. Army Corps of Engineers, Kansas City District, has prepared a draft Environmental Assessment and draft Finding of No Significant Impact (FONSI) in accordance with the National Environmental Policy Act (NEPA) of 1969, as amended, for the Grand River ecosystem restoration feasibility study. Components of the tentatively selected plan would be located on and around Pershing State Park, Fountain Grove Conservation Area and Swan Lake National Wildlife Refuge in Carroll, Chariton, Linn and Livingston counties in north central Missouri. The tentatively selected plan also includes implementation of bank stabilization projects in the upper portion of the Locust Creek sub-basin. Projects may be implemented in the Watkins Creek-Locust Creek (excluding the portion in Iowa); East Locust Creek; West Locust Creek; and Locust Creek watersheds. The overall purpose of the study is to identify a plan that will achieve ecosystem restoration benefits within the Lower Grand River sub-basin. Specifically, to reverse the trend of degradation of wetland, aquatic and floodplain habitats within the areas of Pershing State Park, Fountain Grove CA, Swan Lake NWR, Yellow Creek CA, and surrounding public and private lands. The U.S. Army Corps of Engineers has made a preliminary determination that the proposed action would not result in significant degradation to the environment and therefore supports preparation of a draft FONSI. The EA, draft FONSI and supporting information are provided with issuance of this Public Notice on October 8, 2019 to initiate the public review and comment period, which will extend until November 20, 2019.

  • Next Generation Squad Weapons – Ammunition

    Expiration date: 10/11/2019

    The U.S. Army Corps of Engineers, Kansas City District, has prepared an Environmental Assessment (EA) and draft Finding of No Significant Impact (FONSI) in accordance with the National Environmental Policy Act (NEPA) of 1969, as amended, for the proposed construction and operation of a Next Generation Squad Weapons – Ammunition (NGSW-A) production facility at Lake City Army Ammunition Plant (LCAAP). The project is located on the east side of Independence, Mo. and less than 5-miles from the City of Buckner, Mo. The purpose of the Proposed Action is to construct and operate a NGSW-A manufacturing facility for the production of 6.8mm general purpose and special purpose ammunition at LCAAP. The U.S. Army Corps of Engineers, Kansas City District has made a preliminary determination that the proposed action would not result in significant degradation to the environment and therefore supports preparation of a draft FONSI. The EA, draft FONSI, and supporting information are provided with issuance of this Public Notice on September 11, 2019 to initiate the 30-day public review and comment period.

  • Notice of Availability and Draft Master Plan for Clinton Lake

    Expiration date: 4/12/2018

    The U.S. Army Corps of Engineers, Kansas City District has prepared a draft Master Plan for Clinton Lake with an environmental assessment and associated finding of no significant impact (FONSI) in accordance with the National Environmental Policy Act that are available for public review.