KANSAS CITY, Mo. - The U.S. Army Corps of Engineers, Kansas City District is seeking comments on a tentatively selected plan for the Stockton Lake water supply storage reallocation study.
The tentatively selected plan proposes to reallocate 45,750 acre-feet from the Stockton Lake multipurpose pool and 49,000 AF from the flood control pool, with a 1.8-foot increase to the normal pool elevation. The plan would also include a new water intake structure within the existing City Utilities of Springfield easement at Stockton Lake.