MANHATTAN, Kan. – The U.S. Army Corps of Engineers, Kansas City District announced an upcoming periodic inspection at Tuttle Creek Lake, to include dewatering of the stilling basin below the dam. Preparations for the inspection begin October 9, 2020 with the closure of lake releases and subsequent lowering of River Pond for approximately three weeks. Until then, releases are scheduled to continue with a target lake elevation of 1078 feet above mean sea level.