Kansas City District USACE supports flood risk reduction study for Valley Creek, Alabama – now signed by the Chief of Engineers

Kansas City District, Northwestern Division, U.S. Army Corps of Engineers
Published Nov. 1, 2021
The Kansas City District supported the Mobile District with personnel and organization. The montage represents many of the team members for the Valley Creek Flood Risk Reduction Project Delivery Team. Local leaders in Bessemer, Birmingham and other communities supported the feasibility study which led to the Chief of Engineers, Lt. Gen. Scott Spellmon, to sign the Chief's Report to Congress, Friday, Oct. 28, 2021. That refers the action for Congressional consideration and it may be included for authorization in the next Water Resources Development Act and then separately funded in follow-on legislation. The study recommends two retention basins be constructed along Valley Creek to mitigate the height of the water during seasonal and intermittent flooding.

The Kansas City District supported the Mobile District with personnel and organization. The montage represents many of the team members for the Valley Creek Flood Risk Reduction Project Delivery Team. Local leaders in Bessemer, Birmingham and other communities supported the feasibility study which led to the Chief of Engineers, Lt. Gen. Scott Spellmon, to sign the Chief's Report to Congress, Friday, Oct. 28, 2021. That refers the action for Congressional consideration and it may be included for authorization in the next Water Resources Development Act and then separately funded in follow-on legislation. The study recommends two retention basins be constructed along Valley Creek to mitigate the height of the water during seasonal and intermittent flooding.

The U.S. Army Corps of Engineers, Kansas City District, collaborated on a feasibility study on flood risk reduction for a creek in Alabama with the Mobile District and local leaders over the last three years.

The Chief of Engineers, Lt. Gen. Scott Spellmon, signed the Chief’s Report on Friday, Oct. 29, 2021 referring the action to Congress where the project could be taken up in the next Water Resources Development Act. If approved, separate appropriations legislation would have to be passed to fund the construction of the project to benefit communities extending from Birmingham to Bessemer, Alabama via the Valley Creek Flood Risk Management Project.

Lt. Gen. Spellmon approved the Project Delivery Team recommendations that call for construction of two detention basins along Valley Creek which would temporarily store flood water to reduce downstream impacts. Water would be gradually released back into the creek after the high waters have receded. The creek flows southwest from Birmingham and has overflowed many times over the years causing dangerous conditions and significant damage to homes and businesses near the creek.

The areas chosen for the detention basins in the study, use low-lying areas for retaining flood water in constructed ponds which will also have trails and park benches added, tying into the existing Jones Valley trail, to enhance the recreation opportunities in the area.

This study was led by the Kansas City District, U.S. Army Corps of Engineers, and conducted by Kansas City and Mobile District staff.  Learn more about this project through U.S. Army Corps of Engineers, Mobile District here: https://go.usa.gov/xeaMs

“I am especially thankful for the local leaders who took part in the study. They knew what the problems were and who was affected the most. That helped us focus on reducing the risk of flooding for the most people across a wide range of events,” said, Ron Jansen, Project Delivery Team Project Manager, Kansas City District.


Contact
Kansas City District Public Affairs
816-389-2214
CENWK-PA@usace.army.mil
Kansas City, MO

Release no. 21-061