Civil Works/Planning Public Notices

Results:
Archive: September, 2025
Clear
  • Smoky Hill Draft Feasibility Study and Integrated Environmental Assessment (EA) and associated unsigned Finding of No Significant Impact (FONSI)

    Expiration date: 10/22/2025

    INTRODUCTION: The U.S. Army Corps of Engineers, Kansas City District (USACENWK), has prepared a Draft Feasibility Study and Integrated Environmental Assessment (EA) and associated unsigned Finding of No Significant Impact (FONSI) in accordance with the National Environmental Policy Act (NEPA) of 1968, as amended, for the Smoky Hill Aquatic Ecosystem Restoration Project (Project). The Draft Study and Integrated EA was prepared to assess and document potential effects to the human and natural environment of the project’s Proposed Action. The USACE has made a preliminary determination that the proposed action would not result in significant degradation to the environment and therefore supports preparation of a Draft FONSI. The Draft Study and Integrated EA, Draft FONSI, and supporting information are provided with issuance of this Public Notice to initiate a 30-day public review and comment period.

  • Draft Feasibility Report and EA available for Little Blue River Flood Risk Management Study

    Expiration date: 11/2/2025

    The U.S. Army Corps of Engineers, Kansas City District (USACE) has prepared a Draft Integrated Feasibility Report and Environmental Assessment (EA) in accordance with the National Environmental Policy Act (NEPA) as part of the Little Blue River Flood Risk Management Study (Study). The Draft Integrated EA was prepared to assess and document potential effects to the human and natural environment of the proposed action. The USACE anticipates that the proposed action would not result in significant degradation to the environment. The Draft Integrated EA and supporting information are provided with issuance of this Public Notice to initiate a 30-day public review and comment period.